top of page

Flex Face Installation



High level 8m x 3.7m Flex face sign installation @ Saint-Gobain Formula, Newark Factory.


This is a cost effective solution for regular corporate changes as only the flex face skin is changed.




Removal of old sign and frame, installation of new frame and flex face skin.



Comentarios


bottom of page